Why Coordination Between Trades Matters More Than Ever
Construction timelines are tighter, sites are busier, and trades often overlap more than ever before. In this environment, even small gaps in coordination can create major delays. Trades that work in isolation risk creating conflicts, rework, and bottlenecks — but when teams communicate and plan together, the entire project flows smoothly.
Today, coordination isn’t just a “nice to have.” It’s a critical part of delivering predictable, efficient builds.
Everything Is Connected
Every trade affects the next. Steel impacts framing. Framing impacts concrete works. Concrete affects access points, sequencing, and measurement accuracy. Even if each trade delivers well on its own, misalignment between them can still cause costly setbacks.
That’s why coordinating trades isn’t just about communication — it’s about making sure each stage supports the next.
Where Coordination Falls Apart
Even the best-planned projects run into issues when trades aren’t aligned. Common problems include:
Sequencing conflicts – A trade starts too early and blocks another.
Misaligned set-out – Measurements that don’t align between framing, steel, and concrete.
Delivery delays – One late delivery stalls multiple trades.
Tolerance mismatches – What’s acceptable for one trade becomes a headache for the next.
Lack of shared planning – Each team working in isolation instead of toward one unified schedule.
These issues create wasted labour, lost time, and frustration on-site — all preventable with proper coordination.
Where Macrofab Stands Out
Macrofab is uniquely positioned because we deliver three major structural scopes:
Structural Steel
Light Gauge Steel (LGS)
Concrete Works
Instead of relying on three separate companies to “sync up,” builders get one coordinated provider that understands how each scope connects.
This gives builders benefits that traditional setups can’t match:
1. Shared Understanding of Tolerances
Our concrete, steel, and LGS teams work off the same measurements, plans, and standards.
No mismatched heights, no offset studs, no steel misaligned to concrete edges — everything fits because it was planned together.
2. Clean Sequencing From Start to Finish
We plan all three scopes in a single timeline, ensuring:
Concrete is ready and set out correctly
Structural steel aligns with the concrete work
LGS frames tie in exactly where the steel and concrete require
No clashing trades. No waiting around. No stepping on each other’s schedule.
3. One Company, One Communication Line
Instead of juggling multiple trades and hoping they coordinate, builders get:
One contact
One workflow
One team responsible for the whole structural stage
Decisions are quicker, problems get solved faster, and accountability is clear.
4. Faster, Smoother Installations
By coordinating all three scopes, we eliminate common delays like:
Realigning steel because of incorrect slab dimensions
Reworking framing to fit around unexpected steel placements
Adjusting concrete because the framing doesn’t match plans
Everything is designed and delivered to work together from the start.
The Result: A More Predictable Build
When trades coordinate, projects move faster, sites stay organised, and builders avoid costly surprises. With Macrofab handling structural steel, LGS, and concrete under one roof, builders get a smoother, more controlled construction experience — from slab to steel to framing.
Less friction. Less downtime. More certainty. That’s what coordinated trades deliver.